User's Manual

Password:root
3.1.2 Upgrading Procedure
Procedure:
1 Preparation->
2 Upgrading uboot->
3 Upgrading system
application and running validation tests.
3.1.3 Tools
These tools will be used while upgrading system: WinSCPPCabove windows
7)、Tera Trem or Xshell 6.
3.1.4 5GmmW gNB Interface Configuration
The parameters of COM connecting 5GmmW gNB and PC should be configured as:
Baud rate:115200Data8bitParitynoneStop1bitFlow controlnoneTransmit
delay1msec/char 0 & msec/line
The IP of GE/FE of PC should be configured as: 192.168.1.100.
The IP of GE/FE of 5GmmW gNB should be configured as: 192.168.1.10defaut
setting of the system.