Assembly Instructions
10
91D0004
VCS300SSBI/500SSBI Series Assembly
CAUTION: Some parts may have sharp edges; to avoid injury, wearing gloves during assembly, lifting or
moving the grill is recommended.
Step 5: Assemble the Grill Unit to the Enclosure
NOTE: This step should be performed by two () persons wearing gloves.
Figure 4
Before positioning the grill unit into the prepared enclosure or insulated jacket, depending on the available
access, it may be necessary to temporarily disconnect the LP regulator or Natural Gas connector hose
from the steel flex line.
Carefully position the grill unit into the opening from the front and raised slightly, while ensuring the gas
feed tubing is fed through the hole provided in the bottom of the enclosure opening. Push the unit back into
its final position and check for proper fit.
Reattach the LP regulator or Natural Gas connector hose if it was removed and check all connections for
leaks. Reinsert the grease tray into its place.
CAUTION: The end of the steel flex line should be clamped to the surrounding structure to prevent exces-
sive movement.
CAUTION: Do not turn on the grill unit until after performing a leak check at all connection points and fit-
tings. Use a spray solution of 50% dish soap and 50% water onto all connection points and fittings. Forma-
tion of bubbles indicates air leaks.
"
SETGRILLBODY
Figure 4
B57