Installation Instructions
ANCHORING THE BASE RAIL TO THE GROUND (NO CONCRETE SLAB)
If your building is not on a concrete slab, you will need to level the ground where the Base Rail assembly will be in-
stalled and anchor the assembly with ground anchors at each T-Section. Attach the Base Rail Assembly ends to the
building frame with a Angle bracket (G) and 6 self-drilling screws as shown below.
STEP 2: ASSEMBLY OF VERTICAL TUBES
Place 3 Back Vertical tubes (D) onto Base Rail T-Sections (A). Place a Long Vertical Extension (F 30 1/2”) on the top
of the center Back Vertical Tube and a Short Vertical Extension (E 16”) on the two remaining Back Vertical Tubes.
Use a level to properly plumb the vertical assemblies and fasten the Vertical Extensions to the Building rafters and
peak with a Flat Bracket (H) and 6 Self-Drilling Screws per bracket on the inside of the building. (You may want to
attach the flat bracket to the extensions before you place them on the back vertical posts. Brackets should be located
on the inside of the building.) Now, secure each Vertical Tube joint with two #12 x 3/4” Self-Drilling Screws per joint.
PAGE 16
ANCHORING THE BACK BASE RAIL ASSEMBLY TO A CONCRETE SLAB
Place the back base rail assembly at the back of the building, flush with the back frame assembly. The pins on the
T-Connectors should be vertical. Now, attach the ends of the back base rail assembly to the side base rail vertical
pins with Angle brackets (G) and 6 screws as shown below. Make sure that the assembly is straight before you drill
your anchor holes for concrete wedge anchors. Install the concrete wedge anchors as you did the anchors on the
side base rails at each T-Connector.
JOINT DETAIL
D
E
F
E
H
A
A
A
FLAT BRACKET
ASSEMBLY
ANCHOR
HOLE
ANCHOR
HOLE
NOTE: Ground anchors can also
be set in concrete. ( see page 6)
# 12 X 1” HEX HEAD
SELF-DRILLING
DETAIL OF ANGLE BRACKET
G
G
1/2” x 7” CONCRETE
WEDGE ANCHORS
(NOT INCLUDED)