Installation Instructions

FRONT ENCLOSURE FOR 20' WIDE BUILDING
NOTE THAT STOR-PORTS WILL HAVE A FRONT ENCLOSURE INSTALLED AT THE FRONT OF THE
STORAGE AREA. THIS WILL USUALLY BE THE THIRD FRAME SECTION FROM THE BACK.
PART NO.
PART QTY. LETTER
71-8175 LONG HEADER TUBE 2 A
7100-3700 SHORT HEADER TUBE 1 B
7400-2850 HEADER BRACE 1 C
7100-7200 DOOR VERTICAL TUBE 2 D
71-FE-L L-SECTION 2 E
7400-1200 FRONT BASE RAIL 2 F
BK-10 ANGLE BRACKET 6 G
BK-20 FLAT BRACKET 3 H
71-9999 70 PIECE SCREW PACK, #12 X 1” SELF-DRILLING 1 I
ANC-24 GROUND ANCHOR, 30 2 J
SHEET METAL PANELS, 12’ (NOT SHOWN) 3 K
EAVE TRIM, 2 1/4” X 3 1/2” (NOT SHOWN) L
CORNER/GABLE TRIM, 5 1/8” X 5 1/8” (NOT SHOWN) M
SELF-DRILLING WHITE SCREWS 150 N
STITCHING SCREWS 80 O
PAGE 18
SELF-DRILLING
SCREW
SELF-DRILLING
WHITE SCREW
STITCHING
SCREW
A
A
B
G
H
G
H
D
E
G
D
E
F
G
C
F
G
J
PARTS LIST