Installation Instructions
ASSEMBLY INSTRUCTIONS FOR FRONT
ENCLOSURE FRAME FE-20 (20 WIDE)
STEP 1: Assemble Front base Rails and L-Sections
Assemble the Front Base Rails (F) to the L-Sections (E) Do not attach with screws at this time
.
Place one Base Rail Assembly in each front corner of the building as shown and fasten the Front Base Rail (F) to the
side Base Rails of the building with Angle Brackets (G) and Self-Drilling Screws. Place the Angle Brackets on top of
the Front Base Rail.
Now, measure and adjust the L-Sections (E) so that the inside (door opening) edges of the L-Section are 24” from the
outside of the building frame and 16’ apart (door opening). Fasten the joints from the top side with two Self-Drilling
Screws per joint.
STEP 2: Anchoring the Front Base Rail Assembly Note: The ground under the Front Base Rails must be
level.
With the joints secure, square the assembles with the building sides and drive ground anchors through the holes in
the L-Sections into the ground or set the ground anchors in concrete. If Your building is on a concrete slab use
5 1/2” or 6” concrete anchor bolts (not included) to anchor the Base Rail Sections to the slab. (Refer to the bolt manu-
facturer’s instructions for proper installation of anchor bolts.)
HINT: You can use a carpenter’s square to square the Base Rail Sections with the building or snap a chalk line on
the ground from one front corner of the building to the other.
PAGE 19
#12 x 1"
Self-Drilling
Screw
Anchor Hole
G
E
F
24"
DETAIL OF
L-SECTION
ASSEMBLY
GROUND
ANCHOR
(J)
CONCRETE ANCHOR
BOLT (NOT INCLUDED)
SEE NEXT PAGE FOR LOCATION OF FRONT ENCLOSURE ON STOR-PORT FRAME.