Installation Instructions
STEP 3: Assembling Door Verticals
Place one Door Vertical (D) on to one L-Section (E). Square the Door Vertical Tube With the building by measuring
and setting the distance from the outer edge of the building to the inside (door opening) edge of the door Vertical at
24" at the top. This should match the bottom dimension. Put a mark on the rafter above to use as a placement guide.
IMPORTANT: Make sure that your building frame is square before attaching the vertical door tube.
Attach the vertical Door Tube to the rafter with a Flat Bracket (H) and six Self-Drilling screws. The bracket should be
placed at the outside edge of the Vertical Door Tube. Mount the bracket on the inside of the building.
Now, secure the L-Section/Door Vertical joint with two Self-Drilling screws on the side of the Door Vertical away from
the door opening.
Repeat this assembly procedure for the other Door Vertical Tube.
24"
D
E
D
E
STEP 4: Door Header Tube Assembly
Assemble the two Long Door Header Tubes (A) and the Short Door Header Tube (B) as shown. Do not fasten the
joints with screws at this time.
Place the assembly on the ground with the 2” side facing up and fasten an Angle Bracket (H) on each end with the
Outside of the bracket flush with the end of the tube. Use (3) #12 x 1” self drilling screws.
G
A
A
B
G
#12 x 1” HEX Head
Self-Drilling Screw
STEP 5: Attaching the Door Header Assembly
Make a mark on the door opening side of both
Door Vertical Tubes (D) at 84” from the bottom of
the L-Sections.
Note: You will need two people to lift, position and
attach the Door Header Assembly.
Lift the Door Header into place and line up the bot-
tom ends with the marks on the Door Verticals.
Attach the Angle Brackets on the ends of the Door
Header to the Door Verticals with (3)
#12 x 1” self-drilling screws.
PAGE 20
84"
G
G
STOR-PORT FRAME
FRONT ENCLOSURE