Installation Instructions
INSTALLATION OF CORNER TRIM STORAGE SHELTER
EAVE TRIM
CORNER/GABLE TRIM
STEP 2: INSTALLATION OF BACK TRIM (CORNER/GABLE TRIM 5 1/8” X 5 1/8”)
Measure the distance from the bottom of the roof overhang to the bottom of the building and cut a piece of trim to fit.
Place the trim on the back corner of the building below the roof overhang and fasten it to the side and back sheet
metal with 3/4” stitching screws at each major rib. Repeat on opposite back corner.
PAGE 28
STEP 1: INSTALLATION OF FRONT TRIM (EAVE TRIM 2 1/4” X 3 1/2” FOR BUILDINGS WITH NO FRONT EN-
CLOSURE)
Measure the distance from the bottom of the roof overhang on the front corner of the building to the bottom of the
building and cut a piece of Eave Trim to fit. Place the 2 1/4” side of Eave trim on the front of the building and the
3 1/2” side on the side of the building. Fasten the trim to the Sheet metal side with 3/4” stitching screws at each
major rib. If you have a front enclosure, place the Corner/Gable on the front corner of the building
If you have no sheet metal on the front of your building, use self-drilling screws to fasten the trim to the frame post.
Repeat this procedure for the opposite side of the building and fasten it to the sheet metal with 3/4” stitching screws
at each major rib. Use self-drilling to fasten the trim to the front frame post. Repeat this procedure for the opposite
side of the building.
Stitching
Screws
At each major rib
EAVE TRIM
NO FRONT
ENCLOSURE
ROOF OVERHANG
S
I
D
E
F
R
O
N
T
Self-Drilling
Screws into
Frame post
On front
ROOF OVERHANG
Stitching Screws
At each major rib
CORNER/
GABLE
TRIM
B
A
C
K
S
I
D
E
Note: If you purchased a front enclosure for your shelter, please skip this page and proceed to page 29
(Installation of corner and door trim)