Installation Instructions
INSTALLATION OF BACK AND FRONT CORNER TRIM ON BUILDINGS AND
STOR-PORTS
(CORNER/GABLE TRIM 5 1/8” X 5 1/8”)
Measure the distance from the bottom of the roof overhang to the bottom of the building and cut a piece of trim to fit.
Place the trim on the corner of the building below the roof overhang and fasten it to the sheet metal with
3/4” stitching screws at each major rib. Repeat on the three remaining corners.
Note: On Stor-Ports, you will have to notch out the trim at the bottom to fit over the base rail on the front enclosure.
CORNER/GABLE
S
I
D
E
ROOF
OVERHANG
B
A
C
K
O
R
F
R
O
N
T
Stitching Screws
At each major rib
INSTALLATION OF DOOR TRIM
STEP 1: You will find in your Front Enclosure Kit Eave Trim (2 1/4” x 3 1/2’). Cut a piece for each door vertical side
87 1/2” long. Cut a notch out of the top 2 1/4” side of the trim to allow the trim to fit under the door header. Now,
Attach the trim to the door opening with 3/4” stitching screws into each major rib of the sheet metal on the front of the
building. The 2 1/4” service will be attached when you add door seals later. (see page 33)
STEP 2: Use the remaining pieces of trim to trim out the door header. Cut a 45° angle at the corners. This will lap
over the trim that you installed on the sides of the door. The pieces of trim used to trim the door header should
overlap each other. Fasten the trim to the sheet metal with 3/4” stitching screws.
OVERLAP TRIM
3/4" STITCHING SCREW
PAGE 29
3 1/2"
45°
CUT NOTCH
VERTICAL TRIM DETAIL
3 1/2"
3 1/2"
2 1/4” SIDE OF TRIM
2 1/4"
Notch around base rail on Stor-Port
front enclosures.