Installation Instructions

IMPORTANT
Read the following safety warnings and all instructions in their entirety prior to installation. If you have questions or are miss-
ing any parts, contact VersaTube Building Systems Customer Service at 1-800-900-7222 before proceeding.
WARNING:
This structure and its manufactured components are engineered per the instructions and engineering plans provided by Ver-
saTube Building Systems. The use of any framing components or materials in the erection of this structure that are not pro-
duced or provided by VersaTube could negatively affect the structural integrity and will negate any warranty provisions. Ver-
saTube Building Systems and its authorized dealers are not responsible for any structural collapse or failure to perform re-
sulting from additions, add-ons, or manipulation of non-VersaTube components and/or failure to follow approved instructions.
WARNING:
Metal parts may get hot when exposed to high heat or direct sunlight. Avoid contact with skin and wear protective gloves and
clothing to prevent the possibility of burns.
WARNING:
Avoid installation on windy days as wind may create hazards during the installation process. Wind may blow material or
cause partially installed components to collapse prior to being secured or fully installed. The weight of the components or
structure may cause serious injury if it should collapse.
WARNING:
Metal conducts electricity and electrical shock hazards exist since the structure is made of metal. During installation or stor-
age, keep the structure and all components away from electrical sources. Make sure that your selected location is away from
power lines, underground cables, and any other source of electrical power. Serious injury or even death may occur if contact
is made with electrical current.
WARNING:
If the structure is moved once it has been installed, be certain to inspect all components and conditions and follow each and
every step of these instructions to make certain that the structure is securely anchored, properly installed, and aligned. Fail-
ure to follow these steps could lead to collapse of the structure and may result in serious risk of injury.
WARNING:
In the event that your structure is enclosed, be sure to provide proper and adequate ventilation and egress and ingress. Haz-
ardous, poisonous or noxious substances should not be stored in the structure absent proper ventilation and all warnings
and instructions of the manufacturer of the substance. Also, proper ingress and egress should be provided to prevent adults
or children from becoming trapped inside the structure.
WARNING:
If metal panels are selected to cover all or a portion of your structure, be careful of the sharp edges which may cause cuts or
lacerations. Wear protective work gloves and suitable clothing for protection and always take care when handling metal
parts. Always wear safety goggles or glasses when cutting metal or driving/drilling screws.
PAGE 2
SAFETY AND HAZARD INSTRUCTIONS
ABOUT OUR BUILDINGS
 Buildings come in four widths: 12’, 20’, 24’, and 30’.
 Buildings come in three side or eave heights: 8’, 10’, or 12’. Height extensions are required to create 10’ and 12’ side
height buildings. 2’ height extensions for 10’ and 4’ height extensions for 12’.
 Buildings are supplied with 4’,5’ or 6’ on center post spacing depending on the requirements for wind and snow load in
your area of the country.
 The building length will be determined by the number of extension base rails you use. All buildings have starter base
rails which are ether 6’, 8’ or 10’ with 2 or 3 vertical pins. These are installed first on ether side at the front of the build-
ing. After the starter base rails are in place extension base rails are inserted down the length of the building. These ex-
tension base rails will be 8’ and 4’ for 4’ O/C buildings and 10’ and 5’ for 5’ O/C buildings, 6’ for 6’ on center buildings.
 All buildings will have purlins and girts for application of vertical sheet metal.
 The frame layout for the back and front of the building will be different for each building width and height.
 The standard VersaTube® buildings have the following garage door openings: 12’ wide (1) 9’x7’ door, 20’ wide (1) 16’x
7’ door, 24’ wide (1) 16’ x 7’ door or (2) 9’ x 7’ doors (optional), and 30’ wide (1) 16’ x 7’ door or (2) 9’ x 7’ doors
(optional). The frame can be adjusted to accommodate taller doors in the same widths. (Doors not included)
 A side access or walk door frame is provided with each building. (Door not included)
 Window frame kits and windows are optional.
 We recommend that your building be anchored to a concrete slab with built-in footings and a sheeting ledge. A founda-
tion drawing is provided for the proper slab construction. The building can also be anchored to a larger, pre-existing slab.