Installation Instructions

BASIC PARTS LIST: SIZES AND QUANTITIES WILL VARY BY BUILDING WIDTH AND LENGTH
SEE THE PACKING SLIP WITH YOU BUILDING FOR PART NUMBERS AND QUANTITIES.
8’ or 10’ STARTER BASE RAIL
Used on buildings with 4’ or 5’ on
center post spacing
6’ STARTER BASE RAIL
Used on buildings with 6’ on
center post spacing
4’, 5’ or 6’ BASE EXTENSION
RAIL Used on buildings with 4’,
5’ or 6’ on center post spacing
8’ or 10’ BASE EXTENSION
RAIL Used on buildings with 4’ or
5’ on center post spacing
4’ BASE EXTENSION RAIL
Used on buildings with 4’ on
center post spacing
8’ BASE EXTENSION RAIL
Used on buildings with 4’ on
center post spacing
PEAK
SIDE POST
RAFTER
HEIGHT EXTENSION
T-CONNECTOR
L-CONNECTOR
COLLAR TIE BRACKET
LEFT AND RIGHT
2X2 BACK/FRONT BASE RAIL
2X2 VERTICAL EXTENSION
2X2 VERTICAL HEADER BRACE
GARAGE DOOR HEADER,
2X3, SWAGED END.
ANGLE BRACKET
FLAT BRACKET
SINGLE PURLIN BRACKET
DOUBLE PURLIN
BRACKET
TRUSS BRACE END TIE 2” X 2”
BUTYL SEALING TAPE
INSIDE CLOSURE
OUTSIDE CLOSURE
FRONT & BACK GIRTS 1 1/2 SQUARE
#12 SELF-DRILLING
#10 PAN HEAD, SELF–
DRILLING SCREW
1” SELF-DRILLING SCREW
WITH WASHER, PAINTED
PARTS NOT SHOWN ARE 2X3 OR 2X2 STRAIGHT LENGTH
PARTS. SHEET METAL AND TRIM ARE SHOWN IN THAT
SECTION.
PAGE 4
BACK VERTICAL 2X2X81 3/4”
SWAGED ONE END
HAT CHANNEL (ROOF AND SIDES)
4’, 5’, 8’, or 10’ LENGTH.
1/2” x 7” CONCRETE
WEDGE ANCHOR
TRUSS BRACE CENTER TIE 2” X 2”
SWAGED BOTH ENDS