Installation Manual

Versus Technology, Inc.
DT10000-A0001 iii Revision 8 December 1998
Table of Revisions
Rev Date Description Initials Authorized
By:
1
3/7/96 Initial Release. RAV
2
5/1/96 Added Eagle speaker connections; Modified tbl. 1-1, fig. 2-1 and
2-2.
RAV
-
- Multiple comments from reviews. Modified tbl. 3-1, 4-1, and 4-2;
Added figs. 4-3, 4-5, tbl.4-3, para. 3.10, 3.11, 4.1.5
RAV
3
8/1/96 Changed system name. RAV
4
Complete update to cover new high frequency equipment DAD
5
4/2/98 Complete Update/Revision of Hardware Manual to current
specifications and displays.
EPD
6
6/17/98 Updated/Changed hardware specifications to current procedures.
Added Tech Support section. Added Wire Run Check-off Diagram
to manual. Changed Manual Cover Page to reflect products.
EPD
7
Nov. 1998 Changed collector network length diagram to represent a six
collector to one concentrator specification (figure 3-2). Added to
hardware section 1.4 for a display of important system components.
Added to table 12-1 to include current part numbers to parts added.
EPD
8
Dec. 1998 Added Troubleshooting Flow Charts to section 13, for possible
solutions for system hardware problems. Added Figure 7-2. Sensor
Wiring Floor plan. Added Battery Replacement table Section 2.4
EPD
9
3/11/99 Added FCC compliance statements for IR/RF Badge and RF Sensor SKB