Installation Manual

Versus Technology, Inc.
DT10000-A0001 38 Revision 8 December 1998
14.1 Preventative Maintenance Inspection Report
Preventive Maintenance Inspection Report
Customer______________________________ Customer Number______________________ Date___________
FE ___________________________________ FE ID________ Call Number______________________________
Equipment Serial Number_________________ Software Revision _________
Configuration ( )
___ Host Computer Setup ___ Collector Setup ___ Software Intellimotion 3-Pack
___ Pager Computer Setup (Optional) ___ Punchdown Block Configuration ___ Software Pager (Optional)
___ Work Station Computer (Optional) ___ Concentrator Setup (Optional) ___ Software Misc. (Optional)
___ Network Wiring ___ Sensors
___ Sensor Wiring ___ ASM (Optional)
___ ASM Audio Wiring (Optional)
Tools
1. Standard hand tools 3. RJ Tester 4, 6 & 8 Pins 5. ESD Mat and Wrist Strap
2. Multimeter 4. Hardware & Software Manuals
Visual Inspection ( )
Inspect the following for excess wear and/or any visual signs of damage.
1. ___ General 5. ___ Connectors 8. ___ Cable insulation
2. ___ Computers 6. ___ Sensor Mounting 9. ___ Collector Mounting
3. ___ Concentrator Mounting 7. ___ ASM Mounting
4. ___ Reseat socketed components/connectors
Cleaning ( )
1. ___ Clean all internals of dust 2. ___ Clean external surfaces 3. ___ Clean ASM Area
4. ___ Clean Sensor Work Area(s) 5. ___ Clean ASM Work Area(s) 6. ___ Clean All Computer Stations
7. ___ Clean Infrared Tag
Calibration ( )
1. ___ N/A
Electrical Safety Checks ( )
1. ___ Wall Receptacle Test
2. ___ Sensor Voltage Test
3. ___ Collector RJ Line Continuity Test