Manual

7 1/4"
6 3/4"
1
Horizontal bracing
6
5
7
GRAVITY FLOW RACK
STEP 1:
7 - RUBBER BASE UPRIGHT GRIP - 4PCS./UNIT
6 - NUT: M8X1.25 - 12PCS./UNIT
4 - RUBBER SPACERS - 4PCS./UNIT
FLOW-3
5 - BOLT: M8X1.25X50MM - 12PCS./UNIT
3 - ANGLE BRACING - 6PCS./UNIT
ROLLER OVERALL LENGTH - 37"
DIVIDER OVERALL LENGTH - 37"
HORIZONTAL BRACE OVERALL LENGTH - 34"
FLOW-4
ANGLE BRACE OVERALL LENGTH - 41.60"
UPRIGHT - 84"
DIVIDER OVERALL LENGTH - 49"
ROLLER OVERALL LENGTH - 49"
ANGLE OVERALL LENGTH - 52"
2
3
PARTS LIST TO ASSEMBLE UPRIGHTS:
1 - UPRIGHT - 4 PCS./UNIT
2 - HORIZONTOL BRACING - 4PCS./UNIT
UPRIGHT HEIGHT - 84"
HORIZONTOL BRACE OVERALL LENGTH - 46"
4
bolt
Horizontol bracing
angle bracking
angle bracing
angle bracing
upright
rubber spacer
rubber spacer
nut
1 - LAYDOWN 2 UPRIGHTS ON THE FLOOR, WITH OPEN SIDES FACING EACH OTHER.
2 - WHEN ASSEMBLING BOTTOM & TOP HORIZONTOL BRACING, USE THE RUBBER SPACER
3 - CONNECT ONE END OF THE HORIZONTOL BRACING WITH 1ST UPRIGHT AND CONNECT
THE OTHER END OF HORIZONTOL BRACING AND ANGLE BRACING WITH THE 2ND UPRIGHT
4 - USE RUBBER BASE UPRIGHT GRIP ON BOTTOM OF THE UPRIGHTS.

Summary of content (8 pages)