Instructions / Assembly

- 14 -
5. Operating instructions
1. Connect all connecting lines and gas circuits according to the
above picture.
2. Turn on the power switch (light on).
3. Adjust the required voltage according to the gun switch (it
depends on the individual, 60kV ~ 80kV is recommended).
4. The powder is loaded into the powder supply barrel.
5. Press the gun switch again, and the high-pressure powder can be
sprayed out to work.
6. Matters needing attention
1. Good grounding
The grounding wire is attached, which must be connected with the spraying room
during installation. The spraying room is best connected with a special grounding
pile. The working, pendant and support shall also be connected with the ground
wire of the spraying room to prevent discharge noise due to poor grounding.
2. Air source cleaning
All compressed air shall be kept clean, dry and free of oil and water. It is best to
use the air source after freeze-drying treatment. If using the general oil-water
separator, the oil and water shall be discharged frequently to avoid ponding in the
powder barrel air chamber, solenoid valve, gas pipe, etc. or excessive powder
humidity affecting the powder loading rate.
3. Prevent powder spitting
If the new machine spits powder (the powder output is large and small), it is
generally that the air pressure of powder feeding and powder distribution is not
adjusted well. When the powder feeding gas increases, the powder output is large.
At the same time, increase the appropriate amount of powder distribution gas to