User's Manual

Table Of Contents
Chapter 2 Getting Started
Navigating the user interface
T-BERD/MTS 5800 Getting Started Manual
21
Setup/Results
The top button (Setup/Results) is used to toggle between the
Setup screens and the Main (Result) screen. When the Main
screen is displayed, the Setup button appears; when the
setup screens are displayed, the Results button appears.
A Restart button is also provided which allows you to restart
a test (and clear results).
A Start Test/Stop Test button is provided to begin or end a
test.
Additional buttons appear when appropriate for the test appli-
cation you select. For example, if you select a
Layer 4 Multiple Streams Ethernet application, a Toolkit
button is provided which provides a number of tools to simplify
testing.
For descriptions of setup parameters, refer to the testing
manual.
Message Bar
The message bar displays the current test application
selected on the unit. For example, if you selected the Layer 4
Multiple Streams application for a 10GigE LAN circuit, the
following application appears in the message bar:
10GigE LAN Layer 4 Streams Term
If your instrument is configured with two ports for a particular
rate, the currently selected port also appears at the beginning
of the message.