User's Manual

Table Of Contents
Chapter 4 Basic Testing
Running multiple tests
62 T-BERD/MTS 5800 Getting Started Manual
Table 4 lists the applications that are limited to a single test,
or should be run at lower temperatures.
Table 4 Multiple Test Restrictions
Application Restriction
Dual thru You can only run one Dual thru test.
IPv6 Additional tests can not be run when running an IPv6
test.
L3 Triple Play Additional tests can not be run when running a layer 3
Triple Play test.
DS1 Signaling Additional tests can not be run when running a DS1 Sig-
naling test.
VF test Additional tests can not be run when running a VF test.
PRI ISDN Additional tests can not be run when running a PRI
ISDN test.
Any other application at
a line rate less than
10 Gbps
When running any application at a line rate less than
10 Gbps, you can run one additional test at a line rate
less than 10 Gbps while operating the instrument at:
32°F to 104°F (0°C to +40°C)
10 Gbps
applications
When running a 10 GigE Ethernet, OC-192, or STM-64
test, you can run one additional test (at a lower line rate)
while operating the instrument at:
32°F to 95°F (0°C to +35°C)
10 Gbps Packet Capture When running a 10 GigE LAN or WAN application, and
capturing data on Port #1, you can not run a 1 GigE
application from Port #2. If you want to run a 1 GigE
application on Port #2, you must first disable packet
capture for the 10 GigE application running on Port #1.
You can run applications for lower line rates (for exam-
ple, 10/100/10000 Mbps Ethernet) on Port #2 when cap-
turing packets on Port #1 for a 10 GigE application.
Ethernet: Multiple
Streams
Two Multiple Streams applications can not be run simul-
taneously.