Installation Instructions
P.1/1
1)Checkeachisolator'smodelnumberagainsttheinformationonthe
packingslip,beforebeginninginstallation.
2)Securetheisolatorʼsbaseplate(BP)totheequipmentsupport
structure-concretefoundationormetalframe,accordingtothe
equipmentbase'sdrawingsforthelocationsofthemountingholes.All
boltsandanchorhardwaremustbeaminimumofgrade2.Ifrecom-
mendedbythemanufacturerorinstallationengineerahighergrade,
thenfollowtheirrecommendation.Allanchorsmustbeinstalled
accordingtotheinstallationdrawingsandinstructions.
3)Useaforklift,crane,oranyothercertifiedliftingmachinetoraisethe
equipmenttobeinstalled.Slowlylowertheequipmentontopofthe
isolatorsandmakesurethattheequipment'sbaseisperfectlyaligned
withtheisolator'stopplate(BTPorWTP).
4a)Whentheequipment,whichmustbeatthefulloperatingweight,isplacedontotheisolator,
theisolator'sspringwillbecompressedaccordingtotheloadvs.deflectionchartforthismodel.
5a)Loosetherestraintnuts(RN)toallowlevelingofthetopplate(BTP).
6a)Leveleachisolatorinsequencebyturningthelevelingbolt(LB)afullclockwiseturnatatime.
7a)Afterthelevelingisdone,rundownthelocknut(N)totheequipmentʼsbase.
8a)Adjusttheverticalrestraintnuts(RN)toallowafreemovementoftheinstalledequipment
withanallowedgapfrom1/8"to3/16”.
4b)Makesurethatthetopplates(WTP)areproperlyattachedorwelded
totheequipment'sbase.Weldingtosteelbaseispermittedprovidedthe
weldachievestherequiredstrength.
5b)Whentheequipment,whichmustbeatthefulloperatingweight,is
placedontotheisolator,theisolator'sspringwillbecompressedaccord-
ingtotheloadvs.deflectionchartforthismodel.
6b)Loosetherestraintnuts(RN)toallowlevelingofthetopplate(WTP).
7b)Leveleachisolatorinsequencebyturningthelevelingnut(LN)afull
clockwiseturnatatime.
8b)Adjusttheverticalrestraintnuts(RN)toallowafreemovementofthe
installedequipmentwithanallowedgapfrom1/8"to3/16”.
SMSR-B
SMSR-BT
SMSR-BF
10-1/2"
9"
11/16" TYP 2X
3-1/2"
Operating
height
6"
1-1/2"
4-1/4"
Leveling nut
Restraint nut
Leveling bolt
Leveling nut
Base plate
Top plate
RN
LB
BTP
BP
N
WTP
LN
RN
BP
WTP
LN
RN
BP
SMSR-BT
SMSR-BF
SMSR-BT
SMSR-B&SMSR-BF
SMSR-B