Specifications

Page 48 of 61
SPECIFICATIONS (CONTINUED)
3. Vendor shall install and configure Vicon-net on to three Harris County Dell domain workstations
in order to perform administrative tasks using Vicon-Net software in specified areas and buildings.
4. The Dell dual monitor solution and Vicon-Net software shall be installed on the Superintendent,
Assistant Superintendent and the Shift Supervisor’s Dell domain computer.
5. All work performed in all Sections shall be performed in a series of stages building by building or
area by area in order not to disrupt daily business or institution activities.
PRODUCT
System Requirements
1. The Dell dual monitor solution shall include a compatible video card and six Dell Professional 22-
inch Widescreen Panels with Dual Monitor Stand, installed onto specified workstations in
specified areas and buildings.
2. A backup of each workstation with Vicon-Net software installed and configured shall have a
backup DVD and restore image.
EXECUTION
Examination
1. Working Order Verify that all equipment is in working order and within heat tolerances
2. Installation Verify that the equipment has been installed in accordance will all codes and
complies with the Security Electronics General Section and Division 16 requirements
3. Confirm and verify all equipment is in a pristine new condition with manufacturer’s warranty still
intact. Make sure all wiring has been tied down and dressed out to professional standards.
4. Confirm all equipment is clean, wiped off and ready for occupancy and Harris County use.
Closeout
1. In the presence of a Harris County representative and Harris County, verify that the material and
software provided meets this specification. If there are deficiencies and the vendor was at fault or
negligent, the vendor is responsible for immediate correction.
2. Training - Verify all training has been completed as is described in Security Electronics General
Section
3. As-Built Documentation Deliver as-built documents for this section and all sections of the
Security Electronics Division. Also deliver all documents, instructions and literature that came
with the material in this section.
REFUSE/TRASH
Summary of Work
1. Repair, restore, and refinish to original appearance all areas as needed.
2. Vendor is responsible for removing refuse, debris, trash and non-recyclables materials from
construction site and all work areas.
3. All removed refuse, debris, trash and non-recyclables materials are to be placed in transparent bags
for disposal, transparent disposal bags are furnished by Vendor.