Manual

8
9
10
Fit the ceiling structure on top of the structure beams according to the diagram and rotate the locking cams (C) by hand using
a screwdriver - make sure the structures are completely inserted before rotating the locking cams to the locked position.
Fit the Side Panels - make sure the Side Panels are placed in the correct position by checking the diagram. The Side Panels are
xed using the 42mm screws (F) on the top and lower ends, and the 28mm screws (D) on the sides. Use the at heads (E) and
the 4mm Hex Keys (X).