Manual
8
9
10
Fit the ceiling structure on top of the structure beams according to the diagram and rotate the locking cams (C) by hand using
a screwdriver - make sure the structures are completely inserted before rotating the locking cams to the locked position.
Fit the Side Panels - make sure the Side Panels are placed in the correct position by checking the diagram. The Side Panels are
xed using the 42mm screws (F) on the top and lower ends, and the 28mm screws (D) on the sides. Use the at heads (E) and
the 4mm Hex Keys (X).