PEX Installation Manual
Table Of Contents
- 1 Introduction
- 2 Codes, Standards and Certifications
- 3 Viega PEX Installation Methods
- 4 Viega Manifolds
- 5 Viega PEX Press Fittings
- 6 Viega PEX Crimp Fittings
- 7 ViegaPEX Ultra Tubing
- 8 Viega FostaPEX Tubing
- 9 Viega PEX System Design and Sizing
- 10 System Sizing and Calculations
- 11 Water Service Installation
- 12 Installing the ManaBloc
- 13 Mounting the ManaBloc
- 14 Installing Manifold Distribution Lines
- 15 Installing the ViegaPEX Ultra Tubing System
- 16 Fastening the Viega PEX System
- 17 Installing Viega PEX Fittings
- 18 Pressure Testing Viega PEX Systems
- 19 System Disinfection
- 20 Warranty
35
IM-PF 724596 0416
1
2 3
4
5
6
13.4 Mounting the MiniBloc
1.
For proper bracket spacing, measure distance
between the center ribs of the rst and last
MiniBloc modules. Mark this distance on the
selected mounted surface.
2. Align the outside edge of each bracket within
each end mark. Mounting brackets shall be
mounted level and parallel to each other before
afxing the MiniBloc manifold. NOTE: Use both
mounting brackets provided with each MiniBloc
manifold. Ensure the mounting surface is suitable
to support the weight of the manifold and
attached tubing when lled with water.
3. Use two wood screws per bracket, 1" or longer,
to prevent misalignment.
4. Position bottom metal tie-rod into the bottom clip
of the mounting brackets then roll manifold
toward top clip. The MiniBloc may be mounted
either vertically or horizontally.
5. Complete mounting by rmly pushing the
MiniBloc toward the top clip of the mounting
brackets, which should spread and snap over
top metal tie-rod.
Horizontal
Mount
Vertical
Mount
4
3
1
2
Horizontal
Mount
Vertical
Mount
5