Technical information

3
5517 914 - 01
Vitorond 100 Direct Vent Systems Installation
In addition to the following instructions, also
consult Field Controls Direct Vent System manual
for detailed instructions on how to install the
venting system.
Refer to Vitorond 100 Installation and Service
Instructions.
IMPORTANT
Do not install the regular galvanized vent pipe adaptor
shipped with the boiler. This galvanized vent pipe adaptor
is intended for chimney venting application and therefore
must be discarded in a direct vent application.
Use a 4” to 3” reducer (not supplied) to connect an intake
pipe to the Riello burner.
If no air intake is required a=0 then provide combustion
air supply to mechanical room where the burner is installed.
The burner requires fresh air for safe operation and must be
installed in a mechanical room where there are provisions
for adequate combustion and ventilation air.
Avoid dips in the venting system when using the flexible
insulated stainless steel oil vent. The direct vent kit
includes a VRV-4 vacuum relief valve which must be
installed in the air intake pipe as close as possible to the
burner when using a Beckett burner.
*The direct vent kit includes a Viessmann-specific
stainless steel boiler-to-vent transition adaptor.
Installation
Installation of Insulated Stainless Steel Flexible Oil Vent