Operating instructions

14
A
1.
Seal gas shut-off valve A into the
gas supply pipe.
2. Carry out a tightness test.
Note
Only use suitable and approved leak
detection agents (EN 14291) and
devices for the tightness test. Leak
detection agents with unsuitable con-
stituents (e.g. nitrites, sulphides) can
cause material damage.
Remove residues of the leak detec-
tion agent after testing.
!
Please note
Excessive test pressure may
damage the boiler and the gas
valve.
Max. test pressure 150 mbar.
Where higher pressure is
required for tightness tests,
disconnect the boiler and the
gas valves from the gas sup-
ply pipe (undo the fitting).
3. Vent the gas line.
Conversion to other gas types:
Service instructions (details for
converting to LPG are on page
35)
Installation sequence
Gas connection
5772 909 GB