Technical information

Installation of Vitocontrol-S, VD2/CT3-MW1
Installation Steps
500mm (19 11/16”)
273mm (10 3/4”)
Boiler Room Wall or
Adjacent Boiler
1 Control harness (mounting
bracket) is fastened to wall in
similar manner as control on side
of boiler. Use four screws to
support bracket
2 Cover access holes with supplied
blank and fasten to control
harness along with junction box
in step 4.
3 The housing similar to that used
on individual boiler control
provides enclosure for DIN rail
and terminal strip.
4 Fasten metal housing along with
cover for backplate using two
screws. Use one screw at either
end.
2
4
Section 2
Section 2.4
1
Control harness for all commercial
Vitotronic controls same
dimensions. Mark the
measurements required to mount
the harness on a mounting surface
such as side of boiler or boiler room
wall.
The Vitocontrol-S, CT3/VD2/MW1
can be mounted on boiler room wall
or convenient flat surface near
boilers. Refrain from mounting in
any location where water may
cause damage.
IMPORTANT
3