Technical information

Control Wiring Installation Section 3
Installation Steps Quick Overview
Section 3.0
STEP 1
Review information associated with boiler and boiler control drawings
STEP 2
Install boiler control onto side of boiler and plug in sensors and
120VAC plugs into control from control harness
Supply 120VAC to control
STEP 3
STEP 4
Wire LWCO
STEP 5
Wire burner
Control connections 41 & 90
Burner power connections 120/240/208VAC
STEP 6
Control Module Installation
Valve Module 24VAC/120VAC (Mixing and Isolation)
Combustion Air Device Adaptor
Common Combustion Air Device Adaptor
Output Module
Any required control outputs
STEP 7
Vitocontrol-S
Supply 120VAC
Control Module Installation
Communications
STEP 8
BMS Control Connections
Enable/disable
Burner modulation
Extension input module 0-10VDC
5346540 v1.0 09/2006 Technical information subject to change without notice
18