Technical information
Control Wiring Installation Section 3
Installation Steps Quick Overview
Section 3.0
STEP 1
Review information associated with boiler and boiler control drawings
STEP 2
Install boiler control onto side of boiler and plug in sensors and
120VAC plugs into control from control harness
Supply 120VAC to control
STEP 3
STEP 4
Wire LWCO
STEP 5
Wire burner
• Control connections 41 & 90
• Burner power connections 120/240/208VAC
STEP 6
Control Module Installation
• Valve Module 24VAC/120VAC (Mixing and Isolation)
• Combustion Air Device Adaptor
• Common Combustion Air Device Adaptor
• Output Module
• Any required control outputs
STEP 7
Vitocontrol-S
• Supply 120VAC
• Control Module Installation
• Communications
STEP 8
BMS Control Connections
• Enable/disable
• Burner modulation
• Extension input module 0-10VDC
5346540 v1.0 09/2006 Technical information subject to change without notice
18










