Technical information

Control Overview—Burner Power Wiring
Connection of Boiler Power Wiring to Burner
Applicable for both Vitotronic 100, GC1 and 300, GW2
Flexible Conduit
Soft cable
Soft Cable 120VAC, 1PH Supply
Flexible Conduit 120VAC, 1PH Supply
1
2
4
1 Incoming burner motor power
supply 120VAC, 1PH.
Ensure polarity of L/G/N is not
reversed.
2 Connect 120VAC supply to
terminals 21, 22 and 23 on the
DIN rail inside of boiler control
harness. Provide fuseable
disconnect according to local
codes.
3 DIN rail mounted female socket
inside boiler control junction
enclosure used for wiring burner
power.
4 Corresponding plug for burner
wiring is pre-wired for
termination in the burner and
plugs into receptacle mounted
on DIN rail. Refer to burner
manual for correct termination
inside of burner.
5 Burner contains motor starter
and blower motor.
3
5
1
2
4
3
5
CAUTION
!
Refer to burner manual for correct
fuse and wire gauge sizing with
respect to burner electrical
requirements.
Section 3.4
Section 3
Connection Overview
CAUTION
!
Provide disconnect means and over
current protection as required by local
codes
5346540 v1.0 09/2006 Technical information subject to change without notice
39