Technical data
Vitorond 200, VD2A Technical Data
5354 787 - 01
16
Standard Equipment
Note: Boiler controls and burners are purchased
separately. Please see Price List for details.
H The cast iron sections are delivered as individual units
on skids.
H The combustion chamber door is mounted on the front
section.
H The flue gas collector, with two inspection opening
covers (fastened with screws), is mounted on the rear
section.
1 carton containing supply and return headers
1 carton containing insulation panels and cleaning brushes
1 carton containing the boiler control
1 carton containing installation fittings with safety header
IMPORTANT
Ensure specific regional, provincial, or state requirements,
such as fuel train and additional safety control
requirements etc., are known before the product order is
placed, to determine proper burner selection and pricing.
Standard Equipment
Standard equipment includes:
- Boiler base with leveling bolts
- Connection piping with counter flanges and gaskets
- Turbulators are packed in a bag and placed inside the
combustion chamber
When cast iron sections are delivered as individual units:
- Push nipples, high temperature silicone and linseed oil
with graphite based sealant are packed in a carton and
placed inside the combustion chamber










