Operating instructions
156
Heating water buffer cylinder...........104
■ Dual mode temperature................106
■ Hysteresis.....................................104
■ Maximum temperature..................105
■ Set temperature............................104
Heating with electro...........................97
Heat pump 56
■ Closing............................................37
■ Installing.........................................21
■ Opening..........................................12
■ Output.............................................88
Heat pump for drying a building.........99
Heat pump module
■ Calling up diagnosis.......................66
■ Installing.........................................20
■ Removing.......................................18
Heat pump output..............................88
Heat transfer medium........................40
Hydraulic connections........................23
Hydraulic connections overview.........23
Hydraulic parameters, reports..........137
Hysteresis
■ Booster heater................................91
■ Buffer cylinder heating..................104
■ DHW...............................................91
■ DHW heating..................................91
■ Solar circuit pump...........................94
I
Information regarding the electrical
connections......................................122
Inst. heating water heater..................96
Installation............................................8
Installation conditions...........................8
Installation room...................................8
Instantaneous heating water heater
■ Dual mode temperature..................98
■ Maximum stage..............................97
Instantaneous water heater
■ Dual mode temperature..................98
■ Enable............................................96
■ Maximum stage..............................97
Instructing the system user................46
Internal components
■ Overview.........................................71
Internal hydraulics
■ Heating/DHW diverter valve.........101
■ Heat pump for drying a building......99
■ Parameter group.............................99
■ Primary source type......................102
■ Screed program..............................99
■ Secondary pump type...................102
■ Set flow temperature, external
demand.........................................102
K
KM BUS ext. extension......................60
KM BUS mixer cooling.......................58
KM BUS R/C HC1..............................58
KM BUS R/C HC2..............................58
KM BUS solar....................................57
KM BUS Vitocom...............................60
L
Language...........................................78
Level
■ Cooling curve................................112
■ Heating curve...............................108
Load class..........................................66
Load disconnection............................34
Lock out controls
■ Parameter.....................................118
LON
■ Address........................................114
■ Fault manager..............................115
■ LON subscriber E0.........................62
■ Parameter LON module installed. 114
■ Receive interval for data...............115
■ Send/receive time.........................116
■ Slot for LON module.....................127
■ Subscriber number.......................114
■ System number............................114
■ Transmitting/receiving outside
temperature..................................116
LON communication........................114
Keyword index
Keyword index
(cont.)
5441 603 GB