Steam Heating Side Connections only for 92 and 120 USG / 350 and 450 ltr capacity
Multiple DHW tanks
The following installation is also subject to local codes and requirements:
- Install a s team valve and vacuum breaker between steam supply line and each
tank.
Install a drain with a condensate trap at the end of the steam supply line to each
steam v alve.
Install a condensate trap on each heat ex changer outlet before connecting all
condensate lines to a common condensate return line.
or
- Install a s team valve in the common steam supply line.
Install a v acuum breaker after t he steam valve.
Install a drain with a condensate trap at the end of the steam supply line to each
steam v alve.
Install a condensate trap on each heat ex changer outlet before connecting all
condensate lines to a common condensate return line.
Vitocell 300
Condensate trap
Sensor/Aquastat well
Steam supply
Use hemp and pipe dope on all threaded
stainless steel nipples on tank.
Steam valve
Vacuum breaker
Condensate line
All piping reverse return.
1. Pipe together steam and condensate
lines as illustrated. Connections must
be accessible for service (use factory
supplied adaptors).
2. Remove plastic grommets on each
tank where steam and condensate
lines connect (grommets are left
threaded).
3. Install an approved type high limit
aquastat for temperature control of
domestic hot water on each tank.
4. Install aquastat temperature sensor in
sensor well; install steam v alve.
5. Insulate piping.
To ensure uniform heating of domestic
hot water within each tank battery,
install domestic hot water recirculation
as illustrated on pages 21 and 22.
Cap any unused recirculation
connection on each tank.
Follow the control and safety
recommendations of the respective
steam boiler manufacturer.
5167 535 v1.3
Fig 11.
Recommended piping of a t ank battery in a steam s ystem
IMPORTANT
Do not stack more than three tanks.
Stack only tanks of identical size.
WARNING