Operating instructions

21
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps Page
1. Removing the front panels............................................ 23
2. Filling the heating system.............................................. 23
3. Checking the power supply connection
4. Selecting the language (if required) – only for
weather-compensated control units............................. 25
5. Setting the time and date (if required) – only for
weather-compensated control units............................. 25
6. Venting the boiler........................................................... 26
7. Venting the heating system........................................... 26
8. Filling the siphon with water......................................... 27
9. Checking all connections on the heating water side
and DHW side for leaks
10. Designating heating circuits – only for weather-
compensated control units............................................ 28
11. Checking the gas type.................................................... 28
12. Gas type conversion (only for operation with LPG).... 29
13. Function sequence and possible faults....................... 29
14. Checking the static and supply pressure..................... 31
15. Setting the maximum output......................................... 32
16. Checking the balanced flue system for tightness
(annular gap check)........................................................ 33
17. Burner removal............................................................... 34
18. Checking the burner gasket and the burner gauze
assembly......................................................................... 35
19. Checking and adjusting the ignition and ionisation
electrodes........................................................................ 36
20. Cleaning the heat exchanger and installing the
burner.............................................................................. 36
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5457 552 GB
Service