Operating instructions

22
Commissioning steps
Inspection steps
Maintenance steps Page
21. Checking the condensate drain and cleaning the
siphon.............................................................................. 38
22. Checking the neutralising system (if installed)
23. Checking the anode connection................................... 38
24. Testing the anode earth current with an anode tester 39
25. Draining the boiler on the DHW side............................ 41
26. Cleaning the primary store............................................ 42
27. Checking and replacing the magnesium anode (if
required).......................................................................... 43
28. Returning the primary store into use............................ 43
29. Checking the diaphragm expansion vessel and
system pressure............................................................. 44
30. Checking the pre-charge pressure and the DHW
expansion vessel (if installed)....................................... 45
31. Checking the function of safety valves
32. Checking electrical connections for tightness
33. Checking all gas equipment for tightness at operating
pressure........................................................................... 45
34. Checking the combustion quality................................. 45
35. Checking the external LPG safety valve (if installed)
36. Matching the control unit to the heating system ........ 47
37. Adjusting the heating curves (only for weather-
compensated control units)........................................... 53
38. Connecting the control unit to the LON system (only
for weather-compensated control units)...................... 56
39. Scanning and resetting the "Service" display............. 58
40. Fitting the front panels................................................... 60
41. Instructing the system user........................................... 60
Commissioning, inspection, maintenance
Steps - commissioning, inspection and…
(cont.)
5457 552 GB