Operating instructions

9
M
L
2. Prepare the DHW connections.
Install the safety assembly (acces-
sory or on-site provision) in accord-
ance with DIN 1988 in the cold water
line (see page 10).
Recommendation:
Install the safety valve above the
DHW cylinder to protect it against
contamination, scaling and high tem-
peratures.
Connect the drain hose to conden-
sate collector
L
. Remove plug from
condensate collector.
3.
Route condensate hose M to the
back (drain in wall
G
) or to the side
aperture
H
(see page 6).
Route condensate hose with a U-
bend and connect to on-site drain line
or siphon.
4. Prepare the gas connection accord-
ing to TRGI or TRF or all local regu-
lations.
5. Prepare the electrical connections.
Power supply cable: NYM-
J 3 x 1.5 mm
2
, fuse max. 16 A,
230 V/50 Hz.
Accessory cables: NYM with the
required number of conductors for
the external connections.
Allow all cables in area "K" (see
page 7) to protrude 2000 mm from
the wall.
Preparing for installation
Preparing for installation
(cont.)
5457 552 GB
Installation