Operating instructions
1. Position the supplied installation
template on the wall.
2. Mark out the rawl plug holes.
3. Drill 710 mm holes and insert the
supplied rawl plugs.
4. Fit wall retainer with screws sup-
plied.
Preparing the connections
1. Prepare the water connections.
Flush the heating system.
2. Prepare gas connection.
3. Prepare the electrical connections.
Observe valid IEEE standards.
&
A 1.5 m long power cable is fitted
as standard.
&
Accessory cables:
&
NYM-O 2-core min. 0.5 mm
2
.
Preparing for installation (cont.)
8
Preparing for installation
5354 802 GB