Operating instructions

Returning the DHW cylinder to use
A Flange lid
B Gasket
C Earth cable
D Push-on tab
1. Reconnect the DHW cylinder to the
pipework.
2. Insert new gasket B un derneath
the flange lid A.
3. Fit the flan ge lid and tighten the
screws with a maximum torque of
25 Nm.
4. Push earth cable C onto push-on
tab D.
5. Fill the cylinder with potable water.
Checking all gas equipment for soundness at operating pres-
sure
Danger
Escaping gas leads to a risk of
explosions.
Check gas equipment for
soundness.
Further details regarding the individual steps (cont.)
23
Initial start-up, inspection, maintenance
5692 619 GB