Operating instructions

5. Record the actual value on
page 117 of the commissioning/
service repor t.
6. Sele ct the upper rated outpu t.
Constant temperature control
unit:
Press K + d simultaneously:
"1"isshown.
Press a :
"2"isshown.
Weath er compensated control
unit:
Press K + d simultaneously:
"Relay test"is
shown.
Press a :
"Full load"is
shown.
7. Check the CO2 content. If the value
lies outside the above range, take
themeasureslistedonpage24.
8. After testing, press d.
9. Record the actual value on
page 117 of the commissioning/
service repor t.
Further details regarding the individual steps (cont.)
25
Initial start-up, inspection, maintenance
5692 619 GB