Operating instructions

A Compression fittings
B Screws
C Plate-type heat exchanger
1. Shut off and drain the boiler on the
primary and the s econdary side .
2. Rele ase the side clo sures and
pivot the control unit forward.
3. Remove the siphon.
4. Releas e the compression fitti ngs
A,screwsB and pull out the
plate-type heat exchan ger C.
5. Check the primary and secondary
connections f or contamination a nd
scaling; if necessary, replace the
plate-type heat exchan ger.
6. Lubricate the new gaskets/seals.
Install in revers e order with n ew
gaskets.
Checking the temperature limiter
If the burner control unit cannot be reset a fter a fault shutdown, although the
boiler water temperatur e is below approx. 7 5 °C, check the temper ature limiter.
Repairs (cont.)
84
Troubleshooting
5692 619 GB