Operating instructions

Checking the balanced flue system for soundness (ann ular
gap check)
A Combustion air aperture
For balanced flue systems tested
together with the gas fired wall
mounted boiler, some Federal States
(e.g. Northrhein-Westphalia) waive
the requirement for a soundness test
(overpressur e test) during comm is-
sioning by the flue gas inspector.
For such cases we recommend that
your heating contractor carries out a
simple soundn ess test duri ng the
initial start-up of your s ystem. For
this, it wou ld be sufficient to ch eck the
CO
2 concentration in the combustion
air at the annular gap in the balanced
flue pipe.
Thefluepipeisdeemedtobesound,
if the CO
2 concentra tion of the com-
bustion air is no h igher than 0. 2 % or
the O
2 conc entration is at least
20.6 %.
If actual CO
2 values are higher or O2
values are lower, carry out a pressure
testonthefluepipeatastaticpres-
sure of 200 Pa.
Further details regarding the individual steps (cont.)
18
Initial start-up, inspection, maintenance
5692 548 GB