VZ-UNBS SERIES Installation & Handling Guide LED CCTV VIDEO WALL MONITOR Please read this manual thoroughly before use, and keep it handy for future reference.
Installation Note - Handling STEP 1 STEP 2 STEP 3 1. Open the box. 2. Use the handle to pull out the monitor. Do not grab or touch the front bezel. 3. At least 2 people are required to mount or move the monitor. When carrying the monitor, make sure not to carry it in the slanted position. Caution When moving a monitor, • Make sure it's more than one person carrying it. • Make sure not to grab the front bezel in any case. It cause serious panel damage.
Installation Note - Caution Make sure the monitor is not standing at angle. Do not drop or hit the edge of the monitor. Do not place any heavy material on the top of monitor. Do not push the top of front panel by hand. Power / Light Leak Check up Before installation, please connect power to the monitor and confirm the monitor is working correctly. 3 Visit the ViewZ USA website at https://www.viewzusa.
Installation Note - Stacking Gap : Max 1.2mm Make sure to check the protection pads as shown above before installing the monitors. Prior to installation, remove the protection pads. Keep the removed protection pads to use them later as necessary. Gap : Max 1.2mm Avoid impact to the edge of monitor during installation to avoid damage to the monitor. When installing the mounting brackets on the back of the monitor, make sure it sits on a soft surface.