User Manual

Table Of Contents
19User Manual Visit the ViewZ USA website at https://www.viewzusa.com
RXD
GND
The following image is the descripon of RJ-45 PIN MAP
PIN MAP
RS232 (RJ-45) PIN ASSIGNMENT
RXD (Received Data)
GND (Groud)
3
5
2
5
RS232 (DP9) RJ45
1. Download or copy Firmware le from ViewZ.
2. Copy the le to the empty USB
*Cauon - This le should be placed in the root folder of USB.
3. The soware name is xed as FLW_V56, BIN le type.
Please note that the rmware le name should not be modied, otherwise the board cannot idenfy the rmware le.
4. Turn o the monitor and insert the USB drive to the USB interface of monitor.
5. Turn the power back on, then the monitor will be automacally upgraded/updated.
During the upgrade/update process, the power indicator will be ashing.
When the upgrade/update is completedm the power indicator will stop ashing.
6. Aer the upgrade/update process, the monitor will relaunch, indicang the update/upgrade has been completed.
*Cauon - Do not turn o the power or remove the USB during upgrade/update process as the monitor board can be
damaged in doing so.
If your video wall system requires an unied control by the central control (do not use provided video wall screen control
soware), please use the provided RJ-45(RS-232) cables to congure the sytem. If necessary, you can make your own
RJ-45(RS-232) cables based on the above pin map. If you have further quesons, please contact ViewZ.
Firmware Upgrade/Update Process