Installation Guide

MODEL VG06043
10
PLATE
5mm
1
10
3. Position the fixed panel (#4) and the
structural rail assembly (#10) correctly
using a level. Mark the location of the wall
mount brackets on the wall.
4. Remove the rail from the dry fit and remove
the wall mount brackets from the structural
rail.
5. Line the outside of the wall mount brackets
with the markings on the wall. With the
plates still installed to the wall mount
brackets mark the wall at the center portion
of the plate. Note: There is a 5mm
adjustment in the wall mount bracket
plates. It is important to perform a dry
fit prior to install. Once everything is
level and plumb then you can begin
your drilling.
!
B3
B4
10
1
13
4
1
MARK THE WALL
AT THE CENTER
PORTION OF THE
PLATE WITH A
PENCIL
1
B5