Installation Guide

11
D. INSTALLING THE DOOR
1. Remove the rollers (#3) from the box. Remove the cover. The three outside screws is what you
will loosen to place the rollers on the door. The center screw is referred to as the roller height
adjustment screw.
2. Install the door bottom seal strips (#11) onto the bottom of the door panel. [SEE FIG.8]
3. Loosen the screws and dismantle the roller. Place the roller in the space in the glass at the
bottom of the door panel (#5). Fully tighten the adjustment screws and re-install the roller cover.
[SEE FIG.8]
4. Repeat steps 1 and 2 for the other roller.
5. Place the seal strip (#10) to the door panel on the side that closes to the wall. [SEE FIG.9]
6. Position the door on top of the bottom structural rail making sure the rollers are straddling the
rail. Slide the top roller guide (#2) along the fixed panel closer to the door so that the door panel
slides into the opening. Once the top roller guide (#2) is in the correct position with the fixed
panel (#4) and the door panel (#5) both in place, tighten the hex screws to keep in place. [SEE
FIG.10]
7. Note that there is an adjustment on the roller to accommodate walls that are not 100% plumb.
The bottom screw on the face of the roller adjusts the height of the ball bearing inside. You may
need to remove door unit from install to modify height. It will also require two people. One
person to hold the glass in the closed position while the other loosens the roller height
adjustment screw and tightens when the glass is in the desired position. Please refer to pages
13-16 for "Roller Adjustments to Accommodate Out of Square Openings." Once the rollers are
properly adjusted and the door sits flush against the wall in the closed position, the adjustment
will be complete. Fully tighten the adjustment screws and re-install the roller covers. [SEE
FIG.8]
MODEL VG06045
FIG.8
ROLLER (3)
ROLLER HEIGHT
ADJUSTMENT SCREW
ROLLER COVER
5
3
3
11
11
11