Installation Sheet

5
MODEL VG6071
PREPARATION STEPS TO FOLLOW BEFORE INSTALLATION
1. Remove the plastic layer from the base/tub border (if needed). Do NOT remove the plastic layer
off the plastic platform of the base/tub.
2. Properly apply silicone to the wall and base joints.
IMPORTANT
To prevent damage to the finish, you should protect the tub bottom with a cardboard protector
before beginning the installation.
Ensure that there is sufficient structural support behind the shower wall to hold the weight of the
tub door. If there is insufficient support, then reinforce the shower walls with wooden studs prior
to tub door installation. [SEE FIG.1B] (typical for right and left door installation)
CAUTION
!
GASKETS NEED TO BE IN BETWEEN ALL GLASS AND METAL CONTACT. FAILURE TO
DO SO CAN LEAD TO BREAKAGE AND POTENTIAL BODILY HARM.
STUD
FIG.1B
90°
RIGHT CORNER
INSTALLATION
LEFT CORNER
INSTALLATION

Summary of content (15 pages)