Specifications

INSTALLATION AND SET-UP INSTRUCTIONS
SURFACE AND PAD REQUIREMENTS
Your new portable spa must be placed on a uniformly firm,
flat and level surface. A concrete pad 4 inches thick is best.
In order to prevent flooding of the electrical equipment, the
pad must be such that water will drain away from the spa.
If your spa is located near sprinklers, adjust or cap them so
as not to hit the siding of the spa.
NOTE: Do not put your spa on any soft surface such as sand, grass,
crushed rock or dirt. Any settling surface will put an uneven pressure and
tension to the spa structure and may void the warranty.
BALCONIES AND DECK REQUIREMENTS
Decking must be constructed to support 85 pounds per sq. ft.
Balconies must be constructed to meet current state and
local codes.
Gates must be self-closing and self-latching.
Name badge on rub rail indicates equipment location.
ELECTRICAL REQUIREMENTS (VS-500 & 501)
Br
eaker
220v (Destiny River)
Royale, ETS, Aurora III) 220v 110v
CAPACITY 60 amps 50 amps 40 amps 20-amps
POLES 2 2 2 1
# WIRES 4 4 4 3
Never tie ground and neutral together.
Your 110-volt or 220-volt spa pack is designed to be
“PERMANENTLY CONNECTED”.
Your 110-volt spa pack requires an isolated* 110-volt, 20 amp
GFCI (*no other appliances or lights on this circuit at any time)
Use of any extension cord is dangerous and is not to be used in
conjunction with the operation of the spa. Low voltage damage
may result and will void your warranty.
It is the customer
s r
esponsibility to acquir
e necessar
y
permits and to arrange for installation and hook up of
the electrical power.
Your spa comes set up fr
om the factor
y to accept 220v
.
5