Installation Instructions
29
Performance Checklist
□ Verify cabinet size.
□ Verify electrical supply and water supply
(if applicable).
□ Install anti-tip device(s) and verify unit is secure.
□ Position unit in cutout, level at desired height
and secure unit.
□ Plug-in unit and verify operation.
□ Connect water supply (if applicable).
• Verify icemaker fill tube is properly inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
□ Align/square door(s).
□ Verify drain pan is properly installed and there
are no leaks on water connection.
□ Install kickplate.
□ Remove internal packaging and labels and wipe
unit down.
Installer’s information:
Installer’s name:_____________________________
Installer’s company:_________________________
Date: ________________________________________