Connector Kit Installation

6
Preparing Units for Installation
Before removing units from pallet, remove the side trim from each unit, install center trim brackets and connection heater (steps 1
thru 4). Make sure units are unplugged and powered o .
1. Remove the cabinet mounting side trim from the
refrigeration unit surfaces that are being connected
(Trim A). Leave side trim that will be connected to the
cabinet. Save screws to attach center trim in step 2.
2. Install center trim brackets (Item 2) (Trim B) in the
same holes that the factory cabinet mounting trim
was fastened to.
REMOVE TRIM A
INSTALL TRIM B
A
A