Connector Kit Installation

9
Installation
8. If unit leveling feet were used, lower units back onto rollers. Plug in electrical supply and roll connected units into cabinet
cutout. Units must be plugged into separate electric outlets. Connect water supply to each unit.
9. Lift units up to desired height using leveling feet and enagage anit-tip brackets. Attach units to cabinet using cabinet side trim
and fasteners included with the units. Install stainless magnetic side trim once fastened. (Use installation guide included with
individual units as a reference.)
.125”
WHEN INSTALLED