Installation Instructions

18
1
2
3/8”3/8”
(0.95 cm)(0.95
cm)
3/8”
(0.95 cm)
3
Burner heads and burner caps are packed in the cardboard top
pack with the grates. Align burner head on burner base. Place
burner cap on burner head. Place grate onto the burner pan.
Check that unit is level side to side and front to back. The side trim
must be 3/8” (0.95 cm) above countertop. If unit is not level,
repeat Steps 5-7 in “Leveling/Adjustments/Alignment” section.
Slide range into place. Be sure
anti-tip bracket slides into the anti-tip opening.
Final Installation
Connecting Gas & Electric
DANGER
GAS LEAK HAZARD
To avoid risk of personal injury
or death; leak testing of the
appliance must be conducted
according to the manufacturer’s
instructions. Before placing appliance in
operation, always check for gas leaks
with soapy water solution.
• DO NOT USE AN OPEN FLAME TO
CHECK FOR GAS LEAKS.
1
Connect gas and electrical. Before placing appliance in operation,
always check for gas leaks. This must be performed by your
dealer, a qualified licensed plumber, or gas service company.