Installation manual

14
Installation Checklist
IMPORTANT: To ensure a safe and proper installation, review below items directly with installer.
Has all shipping tape, string and packing been removed?
Has the unit been secured in place with the provided anti-tip bracket or is the unit 1 inch or
less from a solid soffit?
Are all levelers extended down to make contact with the floor?
Is the unit level?
Is the power cord connected directly into a properly grounded 3-prong outlet in accordance
with all applicable local codes?
Has all stainless protection film been removed?
Are the panel(s) (wood overlays, if used) attached securely and properly?
Allow the unit to operate for at least 24 hours before loading products or adjusting
temperature settings.