Installation Instructions

24
Performance Checklist
—Verify cabinet size.
Verify electrical supply and water supply
(if applicable).
Install anti-tip device(s) and verify unit is
secure.
Position unit in cutout, level at desired
height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
Verify icemaker  ll tube is properly
inserted.
Verify icemaker bail arm is down.
Verify dispenser operation
(if applicable).
—Align/square door(s).
Verify drain pan is properly installed and
there are no leaks on water connection.
—Install kickplate.
Remove internal packaging and labels
and wipe unit down.
Installers information:
Installers name:__________________________
Installers company:_______________________
Date: ___________________________________