Installation Instructions

41
Verify cabinet size.
Verify electrical supply and water supply
(if applicable).
Install anti-tip device(s) and verify unit is
secure.
Position unit in cutout, level at desired
height, and secure unit.
Plug-in unit and verify operation.
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bailarm is down.
Align/square door(s).
Verify drain pan is properly installed and
there are no leaks in water connection.
Install kickplate.
Remove internal packaging and labels
and wipe unit down.
Installers information:
Installer’s name:
_____________________________
Installer’s company:_________________________
Date: ________________________________________
Performance Checklist