Installation Instructions

22
Performance Checklist
—Verify cabinet size.
Verify electrical supply and water supply (if applicable).
Install anti-tip device(s) and verify unit is secure.
Position unit in cutout, level at desired height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
Verify icemaker  ll tube is properly inserted.
Verify icemaker bail arm is down.
Verify dispenser operation (if applicable).
—Align/square door(s).
Verify drain pan is properly installed and there are no leaks on
water connection.
—Install kickplate.
Remove internal packaging and labels and wipe unit down.
Verify Operations
Control Panel
VRI/FRI/MVRI7240
VFI/FFI/MVFI7240
VFI/FFI/MVFI7180